波多野结衣久久精品99e-超清中文乱码一区-国产日韩精品欧美2020区-337p日本欧洲亚洲大胆在线-午夜99-强制高潮18xxxxhd日韩-免费黄色短片-亚洲欧洲日产国码aⅴ-日韩www.-自拍偷拍av-欧美在线看-国产成人精品无码免费看-免费观看成人-无码av不卡免费播放-亚洲午夜久久久久-国产亚洲精品成人aa片新蒲金-大地资源网中文第一页-国产成人av一区二区三区无码-麻豆av一区二区三区久久-男人的天堂aⅴ在线

Mine Engineering

Mine Engineering

Home > SERVICES > Engineering Solution > Mine Engineering

Jinchuan Nickel Mine
DATE:15 Nov 2017 瀏覽次數(shù):1
+ . -

It is a rare high stress super-large metal deposit with difficulty in mining around the world, and is divided into 4 major mining areas during the geological survey. Mechanical underhand drift consolidated cut-and-fill method is adopted and large equipment including dual hydraulic drill jambo and 6m³ scraper are used. The annual production capacity in Mining Area II reaches 4 million t. The application of processes and techniques such as combined bolt-shotcrete-net-cable support system, rod milling high concentration consolidated filling technique, paste filling technique, improved ventilation system, adjustment of stoping order of drifts enhanced the mining efficiency and resource recovery, with rich experience accumulated for metal deposits where ore rocks are unstable in the high stress area.

The concentrator is composed for primary beneficiation plant, secondary beneficiation plant, tertiary beneficiation plant, concentrate plant and tailings plant, with a total production capacity of 29,000 t/d. The production process of the concentrator is two-stage crushing with one closed circuit, two-stage grinding and two-stage separation cleaning, two-stage dewatering of thickening and filtering. Produced concentrate will be fed into flash smelting and top-blowing smelting systems of the smelter.